Due to high demand and worldwide supply chain issues, we are experiencing longer than normal delivery time frames for many Tormach machines and accessories. We appreciate your patience during this time.
Note: The ONLY way to secure a machine that is currently on backorder is to place an order for one. You may place a deposit to hold your spot in line for machines arriving. Without an order, any dates presented on our website are subject to change with demand.

SET TOOL TABLE (G10 L2)

To define the origin of a work offset coordinate system, program: G10 L2 P~

  • P~ is the number of coordinate system to use (G54 = 1, G59.3 = 9)

The G10 L2 P~ command doesn’t change from the current coordinate system to the one specified by P. Use G54 through G59.3 to select a coordinate system. The coordinate system whose origin is set by a G10 command may be active or inactive at the time the G10 is executed. If it’s currently active, the new coordinates take effect immediately.

EXAMPLE – If a G92 origin offset was in effect before G10 L2, it continues to be in effect after.

TROUBLESHOOTING

It’s an error if:

  • The P number does not evaluate to an integer in the range 0 to 9
  • An axis other than X or Z is programmed