Introducing the new 1500MX CNC Mill. In stock and ready to ship in the continental US. Learn more

Loading...

SIMPLE DRILLING CYCLE (G82)

The G82 cycle is intended for drilling.

Program: G82 X~ Y~ Z~ A~ R~ L~ P~

The G82 cycle is as follows:

  • Step 1: Preliminary canned cycle motion.
  • Step 2: Move the Z-axis only at the current feed rate to the Z position.
  • Step 3: Dwell for the P number of seconds.
  • Step 4: Dwell for the P number of seconds.